Every building we sell is made to order at our plant in Kilgore, Texas, then delivered and installed by our own crew. That means there is a short wait between ordering and install day. For most customers, the typical lead time is 6 to 8 weeks. Here is how the timeline works, step by step.
The Typical Timeline
| Step | What happens | Typical timing |
|---|---|---|
| Design and quote | Design online in our 3D tool or call a sales expert | Same day |
| Order | A 20% deposit and signed paperwork place your order | When you are ready |
| Scheduling call | Our scheduling team calls you | Within 5 to 10 business days |
| Manufacturing | Your steel is fabricated at our Kilgore plant | 6 to 8 weeks (up to 12 for large commercial buildings) |
| Install day | Our crew delivers and installs, usually Monday through Friday | A few hours to one day |
Your Price Is Locked When You Order
Your 20% deposit and signed paperwork lock in your price, even if steel prices rise before your building is made. Deposits are non-refundable, so settle your size, options and site plans before you order. Read more about locking in your price.
What Can Change Your Timeline
- Building size: large commercial buildings can take up to 12 weeks to make.
- Permits: if your city, county or HOA requires approval, get it before install day. Our permit guide explains what to check.
- Site readiness: the site must be level, clear and easy to reach. If you are adding a concrete slab, your contractor needs to finish it before our crew arrives.
How to Stay on Schedule
- Measure your space and pick your size before you order.
- Check permit and HOA rules early.
- Line up any site work, like grading or a slab, during the manufacturing weeks.
- Answer the scheduling call and keep the crew’s path to the site clear.
Install Day Goes Fast
Once your building arrives, most installs take a few hours to one day. See what to expect on installation day, or watch a metal carport install from start to finish.
Quick Answers
How long does install day take?
Most installs take a few hours to one day.
When will I hear from scheduling?
Our scheduling team calls within 5 to 10 business days after you order.
Do large buildings take longer?
Yes. Large commercial buildings can take up to 12 weeks to make.
Ready to get on the schedule? Design yours in our free 3D designer, request a free quote, or call (903) 234-8922 and press 1 for sales.
Ready to Price Your Metal Building?
Get a free, no-obligation quote, or design your building in our free 3D tool and see it from every angle.